UBD | Ubon Ratchathani Industrial

Industrial Estate Information

1700 Rai
Total Area
1200 Rai
Industrial Area
290 Rai
Utility Area
210 Rai
Green Area
8 Rai
Commercial Area

Industrial Estate Area Details

Industrial Area

1,229.50

Utility Area​

294.65

Green Area

214.08

Commercial Area​

9.60

Total area

1747.83

Industrial Area

486.11

Utility Area​

116.49

Green Area

84.64

Commercial Area​

3.80

Total area

691.04

Industrial Area

1,967,200.00

Utility Area​

342,533.60

Green Area

342,533.60

Commercial Area​

15,360.00

Total area

2,796,530.40

Industrial Area

2,950.80

Utility Area​

707.16

Green Area

513.80

Commercial Area​

23.04

Total area

4,194.80

Utility Systems

WATER SUPPLY

Water Supply > 55,000 cu.m./day Expandable up to 100,000 cu.m.

Wastewater Treatment System

Activated sludge biological wastewater treatment system, 5,000 cu.m./day.

External Raw Water Reservoir

An external raw water reservoir, 917 Rai in size, Can store more than 15 million cu.m., Acts as a retention basin to reserve water and ensure water security for the Ubon Ratchathani Industrial Estate.

Energy

Electricity

115/22 kV Substation with 115 kV Transmission line from PEA

Clean Energy

Floating Solar, Solar Rooftop

LNG Gas Distribution System

LNG Storage and Supply

Solar Floating and Solar Rooftop

UBD and energy partners are ready to provide clean energy through Private PPA or based on customer requirements

Transportation and Security

Security

Traffic control, CCTV, Security systems

Roads

Main roads: 36–39 meters wide 4 traffic lanes with median strip

Technology

Telecommunications

Telephone lines, Fiber optics, 5G, and High-speed Internet

EV Charging Station

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare